After two events held under the name of IFAT ENTSORGA, the leading trade fair for environmental technologies is returning to its original name of IFAT. Eugen Egetenmeir, Managing Director of Messe München GmbH (Germany), explains: "The name ENTSORGA was included in the show’s title in 2010, to communicate to the sector the fact that this event was moving from Cologne to Munich. That message has now been understood, and so we are going back to our original, succinct name of IFAT."
As well as the name change, IFAT is also adopting a new claim – "resources. innovations. solutions." This sums up the spectrum covered by the fair and its orientation. The areas of water/waste water and waste/secondary raw materials now come under the overarching term of "resources". IFAT’s brand identity is also transported visually in a new and sophisticated key visual.



At the Liulitun landfill in Haidian District of Beijing, the operator specified their requirement for a landfill gas analyser with ‘high accuracy and strong stability’. After a competitive pitch by Geotech distributor, Onuee Electronics, they selected the Geotech (UK) GA3000 fixed landfill gas analyser.
OTT Hydrometry (UK) will unveil a new groundwater monitor, a new portable flow meter and a new range of dataloggers at WWEM 2012. OTT MD Simon Wills says “This will be a very exciting event because we will be launching new technologies in almost every area of hydrometeorology.”
Amidst growing concern with the consequences of ground level ozone on health, and the continued failure of the UK to meet European air quality directives, Air Monitors, a specialist instrumentation company, has launched a new portable UV-based ozone monitor which significantly enhances the ability to measure the air that people breathe.
Vestas increased the size of their latest wind turbine in order to bump up the capacity from 7 MW to 8 MW. The V164 platform was from the very beginning developed with a possible potential of increasing the turbine size. The progress in the technology development has now shown that an 8 MW version will offer lower cost of energy and at the same time keep the reliability and structural integrity of the turbine unchanged.